Department of
Mechanical Engineering
| Sr.No. | Class - Room Description | No. | Area, Sq. meter | Rooms Equipped with |
|---|---|---|---|---|
| 1 | Classroom | 06 | 455 | Green Board, Seating arrangements, Ceiling Fans, Tube lights, CCTV Camera, LCD Projector, notice board, Internet, one classroom having smart board. |
| 2 | Tutorial Room | 02 | 98 | Green Board, Seating arrangements, Ceiling Fans, Tube lights, CCTV Camera, LCD Projector, Notice board, Internet. |
| 3 | Laboratories | 11 | 1075 | Well equipped with experimental setup as per AICTE norms, Green Board, Seating arrangements, Ceiling Fans, Tube lights, CCTV Camera, LCD Projector, Notice board, Internet. |
| 4 | Faculty Room | 02 | 79 | Seating arrangements, Ceiling Fans, Tube lights, CCTV Camera, Notice board, Internet. |
| 5 | Department Office | 01 | 42 | Seating arrangements, Ceiling Fans, Tube lights, CCTV, Notice board, Internet |
| 6 | HOD Cabin | 01 | 40 | White Board, Seating arrangements, Ceiling Fans, Tube lights, CCTV Camera, Notice board, Internet |
Major Equipments available
| Sr. No. | Major Equipment’s |
|---|---|
| 1 | FFT Analyser and its accessories |
| 2 | Computerized VCR Testing Setup Single Cylinder 4 Stroke Diesel Engine |
| 3 | Bomb Calorimeter with Safety Device |
| 4 | Infra-Red (IR) Thermal Imager with super resolution quality |
| 5 | Flue gas analyzer (O2,CO,CO2,NO,NOx,Draught measurement) |
| 6 | Power Quality Analyzer (MPQ1000 Megger Make) |
| 7 | IR gun (Temp Range 0-1500 C) |
Major Software’s available
| Sr. No. | Major Software’s |
|---|---|
| 1 | Brics CAD 23 |
| 2 | PTC Creo 8 |
| 3 | MATLAB 23 |
| 4 | Automation Studio |
| 5 | ANSYS 23 |
| 6 | Master CAM X9 |
Special Purpose Equipment’s
| Sr. No. | Name Of Aid | Total No. |
|---|---|---|
| 1 | Overhead Projector | 05 |
| 2 | LCD (Data Projector) | 16 |
| 3 | Color Television | 01 |
| 4 | Scanner | 03 |
| 5 | Printer (Laser & Dot matrix) | 18 |
| 6 | Demonstration Models | 146 |
Laboratories

- Area: 105 Sq. m
- Equipment cost: Rs.4774781/-
- Utilisation of lab: (Hours/week)
- Sem I – 24 Hour/Week
- Sem II – 38 Hour/Week

Fluid Machinery Lab
- Area: 60 Sq. m
- Equipment cost: Rs.11,55,234/-
- Utilization of lab: (Hours/week)
- Sem I – 24 Hour/Week
- Sem II – 0 Hour/Week
- utilization of lab by other departments:
- Sem I – 4
- Sem II - 0

Machine Lab
- Area: 105 Sq. m
- Equipment cost: Rs.1126207/-
- utilization of lab: (Hours/week)
- Sem I – 48 Hour/Week
- Sem II – 24 Hour/Week

Design Software Lab
- Area: 175 Sq. m
- Equipment cost: Rs.4158918/-
- Utilization of lab: (Hours/week)
- Sem I – 24 Hour/Week
- Sem II – 32 Hour/Week

Engine Lab
- Area: 105 Sq. m
- Equipment cost: Rs.2707511/-
- utilization of lab: (Hours/week)
- Sem I – 32 Hour/Week
- Sem II – 24 Hour/Week

Model Lab
- Area: 105 Sq. m
- Equipment cost: Rs.763473/-
- utilization of lab: (Hours/week)
- Sem I – 24 Hour/Week
- Sem II – 42 Hour/Week

Fluid Mechanics Lab
- Area: 70 Sq. m
- Equipment cost: Rs.416000/-
- utilization of lab: (Hours/week)
- Sem I – 0 Hour/Week
- Sem II – 24 Hour/Week

Mechatronics Lab
- Area: 70 Sq. m
- Equipment cost: Rs.1067350/-
- utilization of lab: (Hours/week)
- Sem I – 0 Hour/Week
- Sem II – 0 Hour/Week

RAC Lab
- Area: 70 Sq. m
- Equipment cost: Rs.1131598/-
- utilization of lab: (Hours/week)
- Sem I – 0 Hour/Week
- Sem II – 24 Hour/Week

Heat Transfer Lab
- Area: 105 Sq. m
- Equipment cost: Rs.373321/-
- utilization of lab: (Hours/week)
- Sem I – 24 Hour/Week
- Sem II – 0 Hour/Week

Modelling and Simulation Lab
- Area: 105 Sq. m
- Equipment cost: Rs.2515609/-
- utilization of lab: (Hours/week)
- Sem I – 24 Hour/Week
- Sem II – 16 Hour/Week